Above: The station staff prepare for the arrival of a train. © information. May not be reproduced without permission.

Halifax King Cross (1 of 22)

Presented by Steve Hall

Halifax King Cross is a first attempt at P4, and took ten years to build.

Based on the Halifax High Level Railway, it represents the terminus the line intended to have, rather than the one the line's cost of construction permitted in reality.