CRAG Meeting 11 April 2019

SteamAle
Posts: 54
Joined: Sat Apr 24, 2010 2:38 pm

CRAG Meeting 11 April 2019

Postby SteamAle » Sat Aug 10, 2019 5:33 pm

Back to Askrigg for this months meeting. We do like to try and 'play trains', sorry, operate a layout whenever we can. As usual we went to one of the local pubs for our lunch. Ian is spoiled as he has three watering holes within a five minute walk, all of which serve locally brewed Real Ale, oh, they also do good food. All were saddened to hear that Chris King had been having serious health issues, which prevented him from attending.

Ian's eyesight has stopped deteriorating but the loss of vision still gives him lots of problems. This is where having a group of fellow enthusiasts comes to the for as whenever we visit there is usually something for us to fix or repair. Having said that, Ian was so impressed with the Megapoints system on Chris's layout that he has ditched his 'wire in tube' control in favour of servo units. They worked pretty well for the first operating system.
More changes to the operating sequence, although only minor, seemed to creep in.
Attachments
P1050177s.jpg
Not the easiest place to work but Stuart carries out an urgent repair while David Supervises
P1050175s.jpg
Following a point motor failure, the secenery has been removed to gain access, a locomotive is used to check electrical continuity in Scargill sidings
P1050176s.jpg
It all got too much for Ron, or was it the Real Ale?
P1050178s.jpg
Ian working the fiddle yard. The track in the foreground allows continuos running when Ian just wants to sit and watch the 'trains go by!' One of these days he will cut the tracks so that it can lift up as planned to make access for those of us who are vertically challenged!

Return to “Cumbrian Region Area Group (CRAG)”

Who is online

Users browsing this forum: No registered users and 1 guest