Ouse Viaduct/Balcombe/Lewes project
-
- Posts: 850
- Joined: Fri Jul 25, 2008 12:01 pm
Re: Tomorrow Balcombe, the day after the world!
Not much happening on the viaduct at the moment (due to work pressure in my case and getting Matford ready for Scaleforum in John's).
However, whilst over at John's yesterday we tried to set out as many of the pieces as we could to get more of a feel for the size and to think about next moves after September.
This shows about two thirds of the full length, with the balustrades in about the right position and full height piers shown in the middle (apologies for the quality - hand held above my head and in poor light).
The gap between the arch sections and the balustrades is the 'track base', and between each balustrade section is a refuge. Both these components we have now also decided to have laser cut in MDF now we know what can be achieved (and what we want). Some of the panelling detail on the refuges and pavilions will also require some beading/framing to be cut by York in Rowmark (the version of plasticard that can be laser cut).
Construction proper should now be starting in October.
However, whilst over at John's yesterday we tried to set out as many of the pieces as we could to get more of a feel for the size and to think about next moves after September.
This shows about two thirds of the full length, with the balustrades in about the right position and full height piers shown in the middle (apologies for the quality - hand held above my head and in poor light).
The gap between the arch sections and the balustrades is the 'track base', and between each balustrade section is a refuge. Both these components we have now also decided to have laser cut in MDF now we know what can be achieved (and what we want). Some of the panelling detail on the refuges and pavilions will also require some beading/framing to be cut by York in Rowmark (the version of plasticard that can be laser cut).
Construction proper should now be starting in October.
You do not have the required permissions to view the files attached to this post.
Rod
-
- Posts: 850
- Joined: Fri Jul 25, 2008 12:01 pm
Re: Tomorrow Balcombe, the day after the world!
Now that Scaleforum with Matford is out of the way, and having received some more laser cut goodies from York Model Making, John (Re6/6) and I had a productive day today towards turning all the bits into more of a kit of parts prior to assembly.
I got on with marking up the pier sections for the characteristic apertures of the Ouse Viaduct, which involved topographic profiles, Excel spreadsheets and some occasional reality checks. The apertures all start at the same top elevation but the bottom elevation is dependent on ground level and in the centre of the viaduct they extend into the plinth sections as well as the tapered upper piers.
Here you can see the centre lines marked on some of the piers, together with top and bottom of the apertures and drill centre locations for the (41mm diameter) circular sections at the ends of the apertures.
Meanwhile John was making jigs for batch assembly of the tapered piers
And by the end of the day a trial cut for Pier 30 had been made
This was our first real chance also to check on some of the latest pieces for the pavilions and refuges. Here you can see the two layers of 2mm MDF and some Rowmark 'frames' in order to represent the panelling relief on these concrete structures
Finally we were able to lay the whole trackbed length out with the arches and some of the detailed bits, and to put a train down on it - which was somewhat dwarfed!
But apart from the 'play' factor, this exercise was useful in spawning various ideas on construction, length of each section, joining, transportation, and so on.
And what about the rest of the project? Well, just to prevent too much inertia setting in, the bits and pieces for 'Lewes Phase 1' were purchased at Scaleforum, which covers most of this section of the station - the main junctions - and which is planned to occupy some of the oncoming winter evenings productively. Better than 'X Factor' or 'Strictly' any day! This by the way is a section of the whole Templot layout printed (rails only) on A3 sheets and loosely assembled.
I got on with marking up the pier sections for the characteristic apertures of the Ouse Viaduct, which involved topographic profiles, Excel spreadsheets and some occasional reality checks. The apertures all start at the same top elevation but the bottom elevation is dependent on ground level and in the centre of the viaduct they extend into the plinth sections as well as the tapered upper piers.
Here you can see the centre lines marked on some of the piers, together with top and bottom of the apertures and drill centre locations for the (41mm diameter) circular sections at the ends of the apertures.
Meanwhile John was making jigs for batch assembly of the tapered piers
And by the end of the day a trial cut for Pier 30 had been made
This was our first real chance also to check on some of the latest pieces for the pavilions and refuges. Here you can see the two layers of 2mm MDF and some Rowmark 'frames' in order to represent the panelling relief on these concrete structures
Finally we were able to lay the whole trackbed length out with the arches and some of the detailed bits, and to put a train down on it - which was somewhat dwarfed!
But apart from the 'play' factor, this exercise was useful in spawning various ideas on construction, length of each section, joining, transportation, and so on.
And what about the rest of the project? Well, just to prevent too much inertia setting in, the bits and pieces for 'Lewes Phase 1' were purchased at Scaleforum, which covers most of this section of the station - the main junctions - and which is planned to occupy some of the oncoming winter evenings productively. Better than 'X Factor' or 'Strictly' any day! This by the way is a section of the whole Templot layout printed (rails only) on A3 sheets and loosely assembled.
You do not have the required permissions to view the files attached to this post.
Rod
-
- Posts: 850
- Joined: Fri Jul 25, 2008 12:01 pm
Re: Tomorrow Balcombe, the day after the world!
The latest planning session and John's progress on cutting some of the pier apertures certainly makes for some positive vibes on this project. Apart from starting to 'look' right and give encouragement that the final product will match our ambitions for it, getting down with the actual pieces and doing 'trial fits' is a good catalyst for brainstorming and coming up with solutions for the more 'macro' construction issues.
We know from the derived table of dimensions for each pier where the apertures are, and how much of each pier/plinth is exposed above ground level. This is enabling decisions on how far the scale plinths continue below ground on the model, and design concepts for the 'base' of the viaduct - probably stepped in a series of benches just under the scenery rather than a continuous floor with many 'piers' being, like icebergs, largely hidden from view.
The whole thing including approaches is 7m long. We discussed for a while how many sections to divide it into for transport, this being a compromise between minimising joins and getting it into a car. Eventually we settled on five sections of 1.4m each, which is three essentially identical 10-arch sections in the middle and two more of 3/4 arches plus approaches at each end.
Then, where to make the join? At a pier or half way across an arch? Initially we favoured the latter, with detachable balustrades and bricked sections that could be placed to cover most of the joins. But this left little cross section left for 'purchase' at the top for joining, so we are currently planning to make the joins between the arches and have detachable piers between the upper and lower joiners. Joining below the scenery will be straightforward with dowels, bolts and pronged-Ts, but joining at the top is a bit trickier because of accessibility to attach bolts (assuming both sides are potentially on show). At the moment we are thinking along the lines of dowels and high-strength magnets to do the job.
In theory construction now could be quite rapid, although there is no particular hurry and we certainly don't want to rush it. Apart from the main construction there is then also a lot of laminating of parts to do (to make 2mm thick laser cut details into the 4mm thickness we want). So that will undoubtedly mean more jigs to make sure the parts all register properly, and lots of PVAing.
Most of the basic brickwork will use Slaters English bond, but the arch sections (top and bottom of the pier apertures as well) are being etched in brass. Then there's the bracket supports for the refuges - not essential for the structure, but important nonetheless, and probably a casting job, either resin or whitemetal.
There is also a bit of detailed brickwork - 'beading' for want of a better term - which is still causing a bit of head-scratching. I'd like to think there would be something suitable from the world of dolls houses but we haven't found anything yet. Could be down to plastruct angle section filled in with Miliput or similar.
(these are from the piers at the other end of the viaduct from the photo above)
We know from the derived table of dimensions for each pier where the apertures are, and how much of each pier/plinth is exposed above ground level. This is enabling decisions on how far the scale plinths continue below ground on the model, and design concepts for the 'base' of the viaduct - probably stepped in a series of benches just under the scenery rather than a continuous floor with many 'piers' being, like icebergs, largely hidden from view.
The whole thing including approaches is 7m long. We discussed for a while how many sections to divide it into for transport, this being a compromise between minimising joins and getting it into a car. Eventually we settled on five sections of 1.4m each, which is three essentially identical 10-arch sections in the middle and two more of 3/4 arches plus approaches at each end.
Then, where to make the join? At a pier or half way across an arch? Initially we favoured the latter, with detachable balustrades and bricked sections that could be placed to cover most of the joins. But this left little cross section left for 'purchase' at the top for joining, so we are currently planning to make the joins between the arches and have detachable piers between the upper and lower joiners. Joining below the scenery will be straightforward with dowels, bolts and pronged-Ts, but joining at the top is a bit trickier because of accessibility to attach bolts (assuming both sides are potentially on show). At the moment we are thinking along the lines of dowels and high-strength magnets to do the job.
In theory construction now could be quite rapid, although there is no particular hurry and we certainly don't want to rush it. Apart from the main construction there is then also a lot of laminating of parts to do (to make 2mm thick laser cut details into the 4mm thickness we want). So that will undoubtedly mean more jigs to make sure the parts all register properly, and lots of PVAing.
Most of the basic brickwork will use Slaters English bond, but the arch sections (top and bottom of the pier apertures as well) are being etched in brass. Then there's the bracket supports for the refuges - not essential for the structure, but important nonetheless, and probably a casting job, either resin or whitemetal.
There is also a bit of detailed brickwork - 'beading' for want of a better term - which is still causing a bit of head-scratching. I'd like to think there would be something suitable from the world of dolls houses but we haven't found anything yet. Could be down to plastruct angle section filled in with Miliput or similar.
(these are from the piers at the other end of the viaduct from the photo above)
You do not have the required permissions to view the files attached to this post.
Rod
-
- Posts: 850
- Joined: Fri Jul 25, 2008 12:01 pm
Re: Ouse Viaduct/Balcombe/Lewes project
John and I were planning on going up to Sussex yesterday to get some more detail photos (at the time of the last trip we weren't planning on doing the whole viaduct) but in view of the weather we decided to postpone and get some other planning issues out of the way.
One of these was to confirm the distribution of the board sections making up the viaduct and its approaches, and on laying the trackbed laser-cut sections out we decided finally on:
Approach section with 4 arches (1.4m)
10-arch section (1.4m)
9-arch section (1.26m)
10-arch section (1.4m)
Approach section with 4 arches (1.4m)
So the configuration is basically symmetrical with four of the boards of the same length and the centre board shorter by the amount of one arch.
We then annotated all the track bed boards for cutting, including the scheme for overlapping (the 3mm boards have to be laminated together to make a 6mm track bed).
Having done this, we could now start to think about the vertical design of the boards, which will probably 'step down' progressively from each end to the centre as the topography falls.
Meanwhile, drawings are well advanced for production of etches for the curved brickwork sections for the main arches and pier apertures.
As for the field trip - maybe we'll do that in the Spring when the weather is better and the days longer, and probably make it an overnighter to avoid 8 hours of driving all in a single day. Stopping over in the vicinity of the Eridge layout on club night is a distinct possibility!
One of these was to confirm the distribution of the board sections making up the viaduct and its approaches, and on laying the trackbed laser-cut sections out we decided finally on:
Approach section with 4 arches (1.4m)
10-arch section (1.4m)
9-arch section (1.26m)
10-arch section (1.4m)
Approach section with 4 arches (1.4m)
So the configuration is basically symmetrical with four of the boards of the same length and the centre board shorter by the amount of one arch.
We then annotated all the track bed boards for cutting, including the scheme for overlapping (the 3mm boards have to be laminated together to make a 6mm track bed).
Having done this, we could now start to think about the vertical design of the boards, which will probably 'step down' progressively from each end to the centre as the topography falls.
Meanwhile, drawings are well advanced for production of etches for the curved brickwork sections for the main arches and pier apertures.
As for the field trip - maybe we'll do that in the Spring when the weather is better and the days longer, and probably make it an overnighter to avoid 8 hours of driving all in a single day. Stopping over in the vicinity of the Eridge layout on club night is a distinct possibility!
Rod
-
- Posts: 492
- Joined: Sat Jul 26, 2008 4:53 pm
Re: Ouse Viaduct/Balcombe/Lewes project
Progress is being made slowly. All the piers and plinths have now been made. The 'signature' holes have been cut out.
The next thing will be fixing them together, glueing on the plasticard brickwork and making up the first full section of the viaduct proper.
The next thing will be fixing them together, glueing on the plasticard brickwork and making up the first full section of the viaduct proper.
You do not have the required permissions to view the files attached to this post.
John
-
- Posts: 850
- Joined: Fri Jul 25, 2008 12:01 pm
Re: Ouse Viaduct/Balcombe/Lewes project
Yesterday, amongst other things, we made some trial assemblies and placements for the balustrades and refuges on one of the viaduct track bed surfaces. This involved the laminating together of 2mm thick MDF parts from the York Modelmaking collection - of which there will be much more!
Here's some reminders of the real thing:
Copings and plinths will need to be added, and we're still thinking about the refuge support brackets.
Here's some reminders of the real thing:
Copings and plinths will need to be added, and we're still thinking about the refuge support brackets.
You do not have the required permissions to view the files attached to this post.
Rod
-
- Posts: 850
- Joined: Fri Jul 25, 2008 12:01 pm
Re: Ouse Viaduct/Balcombe/Lewes project
Consolidated version of the 'story so far' in the new RMWeb showcase section http://www.rmweb.co.uk/showcase/?p=1954
Rod
-
- Posts: 884
- Joined: Thu May 21, 2009 8:11 am
Re: Ouse Viaduct/Balcombe/Lewes project
Looking good Rod
Make Worcestershire great again.
Build a wall along the Herefordshire border and make them pay for it.
Build a wall along the Herefordshire border and make them pay for it.
-
- Posts: 850
- Joined: Fri Jul 25, 2008 12:01 pm
Re: Ouse Viaduct/Balcombe/Lewes project
Now that the presence of the viaduct in embryo form at Scaleforum has been announced in Scalefour News, as part of the themed demonstration on modelling BR Southern, it's probably time for some more photos of progress:
Joining sections:
Three out of five starting to take proper shape:
Pier detail evolving:
Prototype pavilion with roof resin cast by Mark from KAG:
Corbels 3D printed by Shapeways after design work by Mark:
Joining sections:
Three out of five starting to take proper shape:
Pier detail evolving:
Prototype pavilion with roof resin cast by Mark from KAG:
Corbels 3D printed by Shapeways after design work by Mark:
You do not have the required permissions to view the files attached to this post.
Rod
-
- Posts: 492
- Joined: Sat Jul 26, 2008 4:53 pm
Re: Ouse Viaduct/Balcombe/Lewes project
No 3 centre section has now been clad in plastic card and primer painting has been done.
Still some fettling to be done and various decorative mouldings to cover pier/arch joins and concrete corbels and brickwork to be added.
Still some fettling to be done and various decorative mouldings to cover pier/arch joins and concrete corbels and brickwork to be added.
You do not have the required permissions to view the files attached to this post.
John
-
- Posts: 570
- Joined: Thu Nov 05, 2009 10:28 am
Re: Ouse Viaduct/Balcombe/Lewes project
That is one serious bridge
WOW!!! VERY impressive
WOW!!! VERY impressive
Unthinking respect for authority is the greatest
enemy of truth....
Albert Einstein
Perfection is impossible.
But I may choose to serve perfection....
Robert Fripp
https://www.facebook.com/groups/PadgateWorks/
enemy of truth....
Albert Einstein
Perfection is impossible.
But I may choose to serve perfection....
Robert Fripp
https://www.facebook.com/groups/PadgateWorks/
-
- Posts: 850
- Joined: Fri Jul 25, 2008 12:01 pm
Re: Ouse Viaduct/Balcombe/Lewes project
Some more photos today showing progress on the pavilions and balustrades (using ply sleeper strip for the 'plinths').
You do not have the required permissions to view the files attached to this post.
Rod
-
- Posts: 1253
- Joined: Wed Sep 01, 2010 9:57 am
Re: Ouse Viaduct/Balcombe/Lewes project
Again this is an epic build. The old slanging match of P4 shunting planks will be destroyed for ever after this and JSW's layout hit the circuit. I really look forward to seeign some of this at Scalefourum. Makes my thoughts of a 9ft diameter Donut rather small and insignificant!
Doug
Still not doing enough modelling
Still not doing enough modelling
-
- Forum Team
- Posts: 2427
- Joined: Sun Jul 27, 2008 7:46 am
Re: Ouse Viaduct/Balcombe/Lewes project
DougN wrote:The old slanging match of P4 shunting planks will be destroyed for ever after this and JSW's layout hit the circuit. I really look forward to seeign some of this at Scalefourum.
And that of course is one reason why they will both be there so hopefully lots of people will come along and see the models which so far most of us have only seen on web sites.
DougN wrote:Makes my thoughts of a 9ft diameter Donut rather small and insignificant!
But of course equally valid and worth while. Few people have the space, time or courage to built the likes of Balcombe Viaduct or BNS but the fact that some people do is great. Equally the small shunting plank can represent just as much of an achievement for some people and we will have Croft Depot and Fish Dock Road along as examples of small layouts that are perhaps more easily achievable.
Terry Bendall
-
- Posts: 1253
- Joined: Wed Sep 01, 2010 9:57 am
Re: Ouse Viaduct/Balcombe/Lewes project
Totally agree Terry, My thought is for as small as possible continuous run. about 400 wide with an external diameter of about 2700 to 3000mm. Valid yes, life long layout "no". One person small and acheiveable is what I am aiming at and the likes of this Viaduct and BNS...nuff said. All strength to them. Roll on Scalefourum.
It does beg the question how much rolling stock is required for a small, medium, large, BNS OVBLP. Sized project?
It does beg the question how much rolling stock is required for a small, medium, large, BNS OVBLP. Sized project?
Doug
Still not doing enough modelling
Still not doing enough modelling
-
- Forum Team
- Posts: 2427
- Joined: Sun Jul 27, 2008 7:46 am
Re: Ouse Viaduct/Balcombe/Lewes project
DougN wrote:It does beg the question how much rolling stock is required for a small, medium, large, BNS OVBLP. Sized project?
In my experience the main limiting factor is the amount of room in the fiddle yard, assuming of course you have such a thing, which most people do. There will usually be some trains on the layout but unless you have a system of one train going out of the fiddle yard, which is then replaced by one coming in, you need a bit of spare caapacity. There is of course the important fact of what are you trying to portray and how much stock do you need to do that successfully.
Pulborough (pre-Grouping LBSC) has traverser type fiddle yards that will take trains 7 feet long and there are 10 roads on each one. Not all of the trains are that long but one or two are. After 25 years we now have sufficient trains to run the layout and to give a good representation of the period and these now appear on Brighton Road which uses a cassette system.
On Ravenscroft Sidings (NE England c1988) we have a 6 road traverser fiddle yard at each end and these will take trains 5 feet long, including the loco, so much more limiting but one of the constraints was that the layout should be transportable in a car. (D&E Challenge rules) We are now almost on capacity and will call it a day when the fiddle yard is full.
How much stock you are able to build or convert in the time available will also limit things.
Terry Bendall
Terry Bendall
-
- Posts: 2189
- Joined: Wed Jul 30, 2008 5:56 pm
Re: Ouse Viaduct/Balcombe/Lewes project
Terry Bendall wrote:DougN wrote:It does beg the question how much rolling stock is required for a small, medium, large, BNS OVBLP. Sized project?
In my experience the main limiting factor is the amount of room in the fiddle yard, assuming of course you have such a thing, which most people do.
Not in our case. There are 4 9 road fiddle yards each a minimum of 30 feet long meaning capacity for about 1000 mk 3 coaches.
Cheers
Jim
-
- Posts: 850
- Joined: Fri Jul 25, 2008 12:01 pm
Re: Ouse Viaduct/Balcombe/Lewes project
DougN wrote:One person small and acheiveable is what I am aiming at and the likes of this Viaduct and BNS...nuff said. All strength to them. Roll on Scalefourum.
It does beg the question how much rolling stock is required for a small, medium, large, BNS OVBLP. Sized project?
Well, there's only two of us involved in directly building the viaduct, although we have a growing number of friends who have chipped in from afar - Jim Smith-Wright and Mark Leigh to name but two.
As for stock, most trains will be EMUs on an interval service, and because they will be going at a scale 75mph you won't be able to read the unit numbers to tell that actually we only have one of each
But seriously ... on the steam hauled services we can share some stock with Eridge (if they let us ), but of course there will be heavy reliance on converted RTR and kits for the EMUs, which thankfully are becoming more and more available.
Rod
-
- Posts: 2524
- Joined: Sun Jul 20, 2008 3:54 pm
Re: Ouse Viaduct/Balcombe/Lewes project
jim s-w wrote:Not in our case. There are 4 * 9 road fiddle yards each a minimum of 30 feet long meaning capacity for about 1000 mk 3 coaches.
Sounds like you must have quite a stock building/conversion program to come! And deep pockets as that's better than £5000 just in replacement wheels
Will
-
- Posts: 850
- Joined: Fri Jul 25, 2008 12:01 pm
Re: Ouse Viaduct/Balcombe/Lewes project
Six weeks to Scaleforum, and the London end is really starting to take final shape. The corbels (brackets) for the refuges are preliminary versions, more detailed ones are on the way.
We also now have the stripwood for making the copings for the balustrades. In due course the levels of the pavilions and balustrades will be adjusted to get the relative levels of pavilion and train absolutely right (something also affected by the track and ballasting configuration).
We also now have the stripwood for making the copings for the balustrades. In due course the levels of the pavilions and balustrades will be adjusted to get the relative levels of pavilion and train absolutely right (something also affected by the track and ballasting configuration).
You do not have the required permissions to view the files attached to this post.
Rod
-
- Posts: 492
- Joined: Sat Jul 26, 2008 4:53 pm
Re: Ouse Viaduct/Balcombe/Lewes project
A few snaps of the 'London' pavilions section with experimental primer.
The first resin cast brackets to be replaced in due course.
At this stage all the constituent assemblies are still to be correctly positioned and permanently glued.
The first resin cast brackets to be replaced in due course.
At this stage all the constituent assemblies are still to be correctly positioned and permanently glued.
You do not have the required permissions to view the files attached to this post.
John
-
- Posts: 492
- Joined: Sat Jul 26, 2008 4:53 pm
Re: Ouse Viaduct/Balcombe/Lewes project
Some more progress. Much experimenting on the mortar course 'grouting' was done under the guidance of Tim Maddocks. Several paint combinations/types and finally Games Workshop 'Citadel' acrylics came out as the most user friendly and best for speed of application/process, considering the amount that has to be done!
The resin cast corbels are only temporarily attached and are to be replaced with ones from Shapeways 3D printed ones in due course.
The top structures in grey primer prior to being finished with a beige colour to represent the Caen stone.
The resin cast corbels are only temporarily attached and are to be replaced with ones from Shapeways 3D printed ones in due course.
The top structures in grey primer prior to being finished with a beige colour to represent the Caen stone.
You do not have the required permissions to view the files attached to this post.
John
-
- Posts: 850
- Joined: Fri Jul 25, 2008 12:01 pm
Re: Ouse Viaduct/Balcombe/Lewes project
These are probably the last photos before Scaleforum in (gulp) three weeks time (well we have to leave something in anticipation!). Just to add to John's earlier photos here are some showing the early stages of terraforming and a bit more detail appearing on the balustrades - still in workshop photographic grey - in the form of limewood strip to represent the coping.
At this (London) end the viaduct continues onto an embankment before rejoining the background topography; at the Brighton end the land rises more gradually from the valley floor to the higher ground to the south.
If you get to Scaleforum please drop by and say hello.
At this (London) end the viaduct continues onto an embankment before rejoining the background topography; at the Brighton end the land rises more gradually from the valley floor to the higher ground to the south.
If you get to Scaleforum please drop by and say hello.
You do not have the required permissions to view the files attached to this post.
Rod
-
- Posts: 819
- Joined: Sun Jul 20, 2008 6:02 pm
Re: Ouse Viaduct/Balcombe/Lewes project
Rod,
Just out of curiosity, how much will each section of the viaduct weigh once all the scenic bits have been added?
Cheers,
David
Just out of curiosity, how much will each section of the viaduct weigh once all the scenic bits have been added?
Cheers,
David
-
- Posts: 850
- Joined: Fri Jul 25, 2008 12:01 pm
Re: Ouse Viaduct/Balcombe/Lewes project
No idea David - John and I were pleasantly surprised how little it weighs in its current status, but fibreglass/plaster will add a bit certainly. But what you see now still needs an underframe because the ends of the viaduct are higher than the centre. We might weigh them when they're finished!
Rod
Return to “Layouts and Operations”
Who is online
Users browsing this forum: No registered users and 4 guests