Track building after 40 years hiatus
-
- Posts: 24
- Joined: Thu Mar 05, 2020 12:55 pm
Track building after 40 years hiatus
I think i may have bitten off more than i can chew with the track plan of my new layout. I have a single slip feeding a 3-way tandem with a RH B6 off the LH track. After seeing how others on the forum have built their equally complex trackwork I'm not entirely sure if I'm up to the task i have set myself. I'd appreciate some advice please......
-
- Web Team
- Posts: 1092
- Joined: Fri Mar 16, 2012 7:03 pm
Re: Track building after 40 years hiatus
colinglenister wrote:I'd appreciate some advice please......
I was in the same situation a year or so ago, never having built track before (other than a couple of turnout kits) my track plan involves two double junctions with singles slips, diamonds and plenty of turnouts. I decided that, as well as the pointwork, I'd build all the plain track as well with functional plastic chairs on ply sleepers:
Best advice I can give it to get a Templot plan of your track done and cut all the rails using that before you install them on the layout. Don't be tempted to accept 'close enough' either - rail is relatively cheap so if you screw up, bin it, start again and take your time.
The track I've built so far is far from perfect but, importantly, nothing falls off...
-
- Posts: 2870
- Joined: Tue Jul 29, 2008 4:40 pm
Re: Track building after 40 years hiatus
No need for Templot (which is a learning cliff in itself) you can achieve what you want using the society's templates. People were building successful track long before Templot came along. Plenty of guidance on the 'old' way of doing things.
The gauges make it all quite easy, you can't have too many of them.
Suggest building some of the ordinary points first, before graduating onto the more complex formations. Don't forget, if you get it completely wrong, rail is cheap enough to 'have another go'.
The gauges make it all quite easy, you can't have too many of them.
Suggest building some of the ordinary points first, before graduating onto the more complex formations. Don't forget, if you get it completely wrong, rail is cheap enough to 'have another go'.
Tim V
(Not all railways in Somerset went to Dorset)
(Not all railways in Somerset went to Dorset)
-
- Posts: 1983
- Joined: Wed Jun 23, 2010 1:04 pm
Re: Track building after 40 years hiatus
If you aren't entirely confident about starting with such complex pointwork, then why not build a small test track with one point? If that goes OK you can move on, with that successfully achieved; if not, it's a lot easier to work out what went wrong and fix it. And you end up with a useful test track which you know works, so if something falls off on the layout but not the test track, you know where to look for the problem.
On the design, it's worth remembering that the railways generally avoided complexity unless absolutely essential; complexity meant more expense, both in construction and subsequent maintenance.
On the design, it's worth remembering that the railways generally avoided complexity unless absolutely essential; complexity meant more expense, both in construction and subsequent maintenance.
Regards
Noel
Noel
-
- Posts: 2527
- Joined: Sun Jul 20, 2008 3:54 pm
Re: Track building after 40 years hiatus
I'm not sure I agree with the start simple approach. I think its a good idea to have something you really want in view. If all you want/have room for is a plank, then OK, but if you want a layout I think it best to go for it. What you do need is persistence, and not being afraid of the occasional failure to start with but to go on trying till you get it right. Many a now well respected modeller started from nowhere went strait for a worthwhile result and learned the skills we now recognise as they went along. As to producing track, there is no end of advice already on the digest sheets and on here you will do no better than search through Tony Wilkins posts.
-
- Posts: 1172
- Joined: Mon May 14, 2012 4:27 pm
Re: Track building after 40 years hiatus
Will L wrote:I'm not sure I agree with the start simple approach. I think its a good idea to have something you really want in view.
Hi Colin,
It will be an unusual layout that doesn't have a simple turnout in a yard somewhere, or an ordinary crossover. Start the grand project with the easy bits, and work towards the more complex formations as you gain experience.
cheers,
Martin.
40+ years developing Templot. Enjoy using Templot? Join Templot Club. Be a Templot supporter.
-
- Forum Team
- Posts: 2427
- Joined: Sun Jul 27, 2008 7:46 am
Re: Track building after 40 years hiatus
I am with those who have suggested that you start with something easy. You have an idea of what you want and one thing needed is a RH B6 turnout so build that first. Then progress to the other pointwork.
quote="Tim V"]No need for Templot (which is a learning cliff in itself) you can achieve what you want using the society's templates.[/quote]
Quite right. A template will allow you to cut the rails to length where required although I usually leave those at the ends a bit longer to allow for trimming to length afterwards.
If you are near to an area group then making contact would help even if at the moment groups cannot meet face to face. If you say where you are located there may be a member nearby would help on an individual basis.
Terry Bendall
quote="Tim V"]No need for Templot (which is a learning cliff in itself) you can achieve what you want using the society's templates.[/quote]
Quite right. A template will allow you to cut the rails to length where required although I usually leave those at the ends a bit longer to allow for trimming to length afterwards.
If you are near to an area group then making contact would help even if at the moment groups cannot meet face to face. If you say where you are located there may be a member nearby would help on an individual basis.
Terry Bendall
-
- Web Team
- Posts: 1092
- Joined: Fri Mar 16, 2012 7:03 pm
Re: Track building after 40 years hiatus
Terry Bendall wrote:Tim V wrote:No need for Templot (which is a learning cliff in itself) you can achieve what you want using the society's templates.
Quite right. A template will allow you to cut the rails to length where required although I usually leave those at the ends a bit longer to allow for trimming to length afterwards.
Each to their own obviously, in my case, using Templot was easier than trying to cut and shut printed templates to match the curve of the layout
-
- Posts: 184
- Joined: Wed Sep 29, 2010 6:12 pm
Re: Track building after 40 years hiatus
[quote="Tim V"]No need for Templot (which is a learning cliff in itself) you can achieve what you want using the society's templates. People were building successful track long before Templot came along. Plenty of guidance on the 'old' way of doing things.
I agree that Templot is a learning cliff but I'm not wired up in a way that can understand it. for those who can, it's a great tool to use. In the EAST MIDLANDS AREA GROUP, we are fortunate in having TONY WILKINS and HOWARD BOLTON (JFS) to give guidance. Tony did a series of tutorials to the group some time ago and both have done Templots for me and others. Thanks chaps and good luck to colinglenister.
I agree that Templot is a learning cliff but I'm not wired up in a way that can understand it. for those who can, it's a great tool to use. In the EAST MIDLANDS AREA GROUP, we are fortunate in having TONY WILKINS and HOWARD BOLTON (JFS) to give guidance. Tony did a series of tutorials to the group some time ago and both have done Templots for me and others. Thanks chaps and good luck to colinglenister.
-
- Posts: 2527
- Joined: Sun Jul 20, 2008 3:54 pm
Re: Track building after 40 years hiatus
When I said that I wasn't precluding the idea that you'd start with a simple standard point rather than the slip but that you shouldn't let that limit you ambition. It is well within many peoples ability to move from beginner to competent in one layout.Will L wrote:I'm not sure I agree with the start simple approach. I think its a good idea to have something you really want in view. If all you want/have room for is a plank, then OK, but if you want a layout I think it best to go for it. ...
-
- Posts: 209
- Joined: Thu Aug 07, 2008 2:16 am
Re: Track building after 40 years hiatus
Templot can be a distraction if you allow it to become just that (guess how I know) but is a very useful tool if you wish trackwork to flow beautifully. Reverting to cutting and shunting individual templates seems like turning back the clock several decades, ignoring progress, and tools that are readily available. If getting up a learning curve is a step too far, mightn't there be fellow members of a local group that could assist? That's one of the great benefits of local groups and one that has come to my assistance many times over the years (and still is).
By the same token I'm also unsure why some still build individual items, whether turnouts, diamond crossings, or whatever and then piece them together, just as we once did with Triang or Peco items, rather than building manageable sections of track which again helps towards nice flowing trackwork.
However, each to their own.
Lindsay
By the same token I'm also unsure why some still build individual items, whether turnouts, diamond crossings, or whatever and then piece them together, just as we once did with Triang or Peco items, rather than building manageable sections of track which again helps towards nice flowing trackwork.
However, each to their own.
Lindsay
-
- Posts: 1172
- Joined: Mon May 14, 2012 4:27 pm
Re: Track building after 40 years hiatus
John Donnelly wrote:Each to their own obviously, in my case, using Templot was easier than trying to cut and shut printed templates to match the curve of the layout
Exactly. The Society templates and others are great, and some are very detailed (Exactoscale). But almost without exception they are all straight:
The difficulty in curving and aligning them to known radii to create pointwork on flowing curves was my original reason for developing Templot, see:
https://85a.uk/templot/companion/2_yes_ ... _track.php
The supposed difficulty in using Templot is a myth, if all you want is a curved turnout template. It takes just a few clicks to print whatever you want, as demonstrated in this video:
https://flashbackconnect.com/Default.as ... 4kwp6LaSw2
more info about that: https://85a.uk/templot/companion/your_f ... mplate.php
The greater difficulty is that fewer and fewer folks still have a home printer, but it's equally easy to export a PDF file from Templot for taking to a High St. copyshop.
cheers,
Martin.
40+ years developing Templot. Enjoy using Templot? Join Templot Club. Be a Templot supporter.
Re: Track building after 40 years hiatus
Do beware of possible gauge narrowing when using Exactoscale (or C&L) plastic chairs. To avoid this happening, you should use the "correct" type of track gauge. Others on here will probably be able to tell you what that is.
DT
DT
-
- Posts: 860
- Joined: Thu Mar 20, 2014 12:19 pm
Re: Track building after 40 years hiatus
David Thorpe wrote:Do beware of possible gauge narrowing when using Exactoscale (or C&L) plastic chairs. To avoid this happening, you should use the "correct" type of track gauge. Others on here will probably be able to tell you what that is.
The problem arises as the chairs are designed to hold the rail at a prototypical 1:20 cant. If you use a triangular gauge it has 'legs' that grip the rail at each corner. These may be too long and grip the foot of the rail, forcing it to be upright. Removing the gauge allows the chairs to impose the cant causing the track to become under gauge.
Examine your gauge on a section of rail. The legs should extend no more than the web of the rail, they only need to hold the head where they will not oppose the cant imposed by the chairs. If they are too long file them back.
Good luck, take care and ruthlessly reject any component you believe is not good enough.
-
- Posts: 850
- Joined: Fri Jul 25, 2008 12:01 pm
Re: Track building after 40 years hiatus
Colin, I assume you have seen this
https://www.scaleforum.org/demonstrator ... ron-lewes/
Actual track building starts at slide 14. I'd never built diamonds or tandems before but following the same principles and being methodical it seems to have come out OK.
https://www.scaleforum.org/demonstrator ... ron-lewes/
Actual track building starts at slide 14. I'd never built diamonds or tandems before but following the same principles and being methodical it seems to have come out OK.
Rod
-
- Posts: 24
- Joined: Thu Mar 05, 2020 12:55 pm
Re: Track building after 40 years hiatus
I have only just see all these responses! Looks like i need to adjust my settings to get notifications of replies to my post
Thank you all for you replies and advice.
As for Templot i just cannot see how to use it to create templates or plan the trackwork. So that is a non starter. Luckily all my turnouts are straight or built up from straight turnouts (tandem). Reading all your advice i intend to start with the 2 RH B6 turnouts then the single slip (?), lastly the tandem(?).
I have lots of web pages to read and digest in the near future, thanks to all the suggestions. Woukd you suggest bulding the slip & tandem as a single unit or separately?
Thank you all for you replies and advice.
As for Templot i just cannot see how to use it to create templates or plan the trackwork. So that is a non starter. Luckily all my turnouts are straight or built up from straight turnouts (tandem). Reading all your advice i intend to start with the 2 RH B6 turnouts then the single slip (?), lastly the tandem(?).
I have lots of web pages to read and digest in the near future, thanks to all the suggestions. Woukd you suggest bulding the slip & tandem as a single unit or separately?
-
- Forum Team
- Posts: 3923
- Joined: Sun Jun 29, 2008 8:02 pm
Re: Track building after 40 years hiatus
colinglenister wrote:As for Templot i just cannot see how to use it to create templates or plan the trackwork. So that is a non starter.
Have you tried the tutorials on the Templot forum? They are very clear and step by step. And a simple straight turnout template is only half a dozen clicks most of which are choosing your scale and gauge.
-
- Posts: 1172
- Joined: Mon May 14, 2012 4:27 pm
Re: Track building after 40 years hiatus
grovenor-2685 wrote:And a simple straight turnout template is only half a dozen clicks most of which are choosing your scale and gauge.
Hi Colin,
Here's a video showing how:
https://flashbackconnect.com/Default.as ... 4kwp6LaSw2
And a page about it:
https://85a.uk/templot/companion/your_f ... mplate.php
cheers,
Martin.
40+ years developing Templot. Enjoy using Templot? Join Templot Club. Be a Templot supporter.
-
- Posts: 1425
- Joined: Fri Oct 02, 2009 6:20 pm
Re: Track building after 40 years hiatus
For an alternative to Templot, see the article I wrote in MRJ 71.
(Yes, OK, that was a very long time ago. Alternatively, for a rather more technical explanation of the same data, see the Digest sheets by Derek Genzel - 21.0 and 21.1.)
(Yes, OK, that was a very long time ago. Alternatively, for a rather more technical explanation of the same data, see the Digest sheets by Derek Genzel - 21.0 and 21.1.)
Return to “Track and Turnouts”
Who is online
Users browsing this forum: ClaudeBot and 1 guest