Can someone fill me in as to how these 5-ways units are connected together in a longer frame, if I just butt each tab up , the quadrant is slightly " stepped "in or out of each alternative 5-way unit. The instructions are silent on the approach
thanks
Dave
PS. really we should be designing out BA screws, damm things are frightfully expensive
Mk2 lever frame , connecting 5-way units together
Re: Mk2 lever frame , connecting 5-way units together
Hello Dave,
Just had a look at my frame components to double-check. Although I have not got as far as forming the quadrant plates (I am making four units), there are circular etched recesses on the l/h front and r/h rear of the front flange of the quadrant plates. These recesses overlap each other when bolted together, resulting in a smooth, flush joint. Here is how in understand the assembly stage of that aspect of the units:
Each quadrant plate, from first to fourth in your case, (you do not need a nut on the fifth quadrant plate counting from left to right), should have a (damned!) 8BA nut soldered on the rear of the flange i.e. behind the half-etched recess. The same principle applies to the pivot plates, except they have strengthening washer soldered onto the top of the l/h hole. See page five of the instructions (and aslo page twelve).
I have used 8 BA nuts on the main frame instead of tapping the holes on the rear flanges.
Hope that helps.
Colin
Just had a look at my frame components to double-check. Although I have not got as far as forming the quadrant plates (I am making four units), there are circular etched recesses on the l/h front and r/h rear of the front flange of the quadrant plates. These recesses overlap each other when bolted together, resulting in a smooth, flush joint. Here is how in understand the assembly stage of that aspect of the units:
Each quadrant plate, from first to fourth in your case, (you do not need a nut on the fifth quadrant plate counting from left to right), should have a (damned!) 8BA nut soldered on the rear of the flange i.e. behind the half-etched recess. The same principle applies to the pivot plates, except they have strengthening washer soldered onto the top of the l/h hole. See page five of the instructions (and aslo page twelve).
I have used 8 BA nuts on the main frame instead of tapping the holes on the rear flanges.
Hope that helps.
Colin
Re: Mk2 lever frame , connecting 5-way units together
ah, I see now what you mean , there is an etched recess , thanks , Only 50 levers to go !
Im using M2 and have placed all my BA screws in a safe deposit box for future generations !
Im using M2 and have placed all my BA screws in a safe deposit box for future generations !
-
- Posts: 813
- Joined: Wed Dec 16, 2009 3:47 pm
Re: Mk2 lever frame , connecting 5-way units together
Hello Dave,
Glad to hear that you are now sorted. There is no problem to substitute M2.5 nuts and bolts - though the brass ones are not massively cheaper.
I will see if an addition to the notes would help people to spot this.
Best Wishes,
Glad to hear that you are now sorted. There is no problem to substitute M2.5 nuts and bolts - though the brass ones are not massively cheaper.
I will see if an addition to the notes would help people to spot this.
Best Wishes,