Power and point switching

User avatar
John Bateson
Posts: 808
Joined: Wed Jul 02, 2008 6:39 pm

Power and point switching

Postby John Bateson » Mon Oct 27, 2008 7:48 pm

Finally I have the power and point switching electrickery built and ready to plug in. All wiring lists checked and very few faults during the continuity testing.
Amazing what the threat of a visiting grandson can do ...

The set folds up into a smallish box with a couple of end panels, large connectors to the tracks and points (Fulgurex) and the 'D' type either to the front panel test switches or eventually the lever frame.
IMG_0353 small.jpg
You do not have the required permissions to view the files attached to this post.
Slaving away still on GCR stuff ...

User avatar
John Bateson
Posts: 808
Joined: Wed Jul 02, 2008 6:39 pm

Re: Power and point switching

Postby John Bateson » Mon Oct 27, 2008 7:59 pm

and this is what all that electonics is doing
Plinth 03 Station Throat.JPG
Plinth 02 Main Platform Area.JPG
Plinth 01 Platform Ends and Release Loops.JPG
You do not have the required permissions to view the files attached to this post.
Slaving away still on GCR stuff ...


Return to “Electrics”

Who is online

Users browsing this forum: ClaudeBot and 0 guests