Oops, an update of this thread is long overdue!
Below the baseboard dropper wires have been added, along with the electro-magnets for the AJ couplings. The first of the turnouts has been linked to the actuator and I've been stocking up on the parts required to wire the layout.
Over Christmas I built one of the lever frame kits from society stores (very nice) which I'll be using to control the turnouts. Also, a warehouse building has sprung up at the left hand end of the layout, with a decision made to extend this siding slightly inside the building and onto the fiddle yard beyond.
post-6677-0-06733800-1420927611.jpg
Most recently, I've been hacking about at the FTG Models SPA to narrow the underframe and fit sprung axleguards.
16316654396_84b3e9f2f4_o.jpg
Next on the to do list; connecting the dropper wires to a power feed, paint rails and sleepers and fit the other turnout actuators. Also need to make my mind up about fiddle yard design.
You do not have the required permissions to view the files attached to this post.